Stakeholder diagram for Durban Water Recycling
Figure presents a stakeholder diagram for the Durban wastewater recycling project. The total investment in the project was R72 million (US$4.858 million). Equity from Durban Water Recycling company was 19 per cent of the investment cost. After signing a 20-year concession contract with the eThekwini Water Services (municipal utility), the Durban Water Recycling consortium approached…
-
Produced by:GRID-Arendal/Studio Atlantis
-
Year:08/07/2020
Stakeholder diagram for Durban Water Recycling
Overview
What’s Inside
How to Use This Collection
Why It Matters:
Use Constraints
-
Region:
-
Activity:
-
Impact Area:
-
Competences:
-
Tags:
