Stakeholder diagram for Durban Water Recycling

Figure presents a stakeholder diagram for the Durban wastewater recycling project. The total investment in the project was R72 million (US$4.858 million). Equity from Durban Water Recycling company was 19 per cent of the investment cost. After signing a 20-year concession contract with the eThekwini Water Services (municipal utility), the Durban Water Recycling consortium approached…

  • Produced by:
    GRID-Arendal/Studio Atlantis
  • Year:
    08/07/2020

Stakeholder diagram for Durban Water Recycling

Overview

What’s Inside

How to Use This Collection

Why It Matters:

Use Constraints

  • Region:

  • Activity:

  • Impact Area:

  • Competences:

  • Tags: